In 2022, a state-of-the-art data center dedicated to Bitcoin mining was established in Siberia, Russia. This project involved the installation of 20MW power transmission and distribution equipment to support the high energy demands of Bitcoin mining operations. The project aimed to provide a reliable and efficient power supply to ensure uninterrupted mining activities.
2022
Siberia, Russia
Power Transformers: S9-2500KVA 10/0.4KV (20 units)
Low-voltage Switchgear Cabinets: 20 units
Power Supply Cabinets: 200 units