In 2018, a major upgrade project was initiated to enhance the electrical infrastructure of Ashgabat, the capital city of Turkmenistan. The project involved the installation of a 2500KVA substation to support the growing energy demands of the city. The new substation was equipped with advanced power transformers, medium voltage switchgear, and low-voltage switchgear to ensure a reliable and efficient power distribution system.
2018
Ashgabat, Turkmenistan
Power Transformers: S9-2500KVA 10/0.4KV
Medium Voltage Switchgear: KYN28
Low-voltage Switchgear: GGD